Wherever you are, 
click the totem (here) to return to the Home page

Layouts

A new O gauge layout, commenced January 2006

November 2008

Back Return Next

Layout progress, November 2008

The new board in position, with the fire station comfortably hiding the area of board not covered in paving. The bare board could easily be covered in future, if the buildings are rearranged. Two Dinky vehicles sit proudly outside the fire station.

Return to Layouts