Wherever you are, 
click the totem (here) to return to the Home page

O Gauge Layout

Commenced January 2006

Clicking the thumbnails will display full sized images.

March 2006

The layout probably does not appear to have changed much since January, although quite a lot has been achieved. The upper level has been removed, to allow access to the lower level, for final track fixing, and wiring.

Track laying continues 
Track laying continues
Buildings appear 
Buildings appear
Movement, at last 
Movement, at last
Progress with wiring 
Progress with wiring

Return to Layouts Front Page