Wherever you are, 
click the totem (here) to return to the Home page

Layouts

A new O gauge layout, commenced January 2006

30th June 2006

Back Return Next

The layout takes shape

Following installation of the backdrop, the two rail track was screwed to the boards, and colour coded wiring installed. This shot shows a Kusan New Haven AA unit crossing the front bridge.

Return to Layouts